Aggregate planning: overtime, temps or subcontracting?
When seasonal orders double, should a factory use overtime, temps or subcontracting? Across a six-month furniture model, temps beat subcontracting past 1.62 months, undercut overtime past 2.55 months and cut cost by nearly 17 per cent against hire-and-fire.

Take an illustrative wooden dining-chair workshop in Bình Dương facing a steep six-month demand curve: 1,400, 1,500, 1,900, 2,400, 2,800 and 1,600 chairs. Twenty permanent carpenters currently staff the benches; at 2 standard hours per chair across a 22-day, 8-hour working month (176 hours, or 88 chairs per worker), regular shopfloor capacity sits at 1,760 chairs a month. Months 3, 4 and 5 exceed regular capacity (peaking at a 1,040-chair deficit in month 5) before month 6 drops back below baseline: hitting every shipment at lowest cost means pricing unit economics across peak duration before touching permanent headcount.
Overtime, temps or subcontracting? Unit economics and duration break-evens
Before testing six-month schedules, translate all five capacity levers in this workshop onto an identical basis: marginal labour and holding cost per finished chair.
Permanent carpenters earn 40,000 VND per standard hour, giving 80,000 VND of direct labour per chair (7.04 million VND per worker per month). Overtime pays a 150 per cent rate (60,000 VND per hour, or 120,000 VND per chair) and is capped at 20 per cent of regular hours to protect worker safety and joint accuracy, limiting plant overtime to 352 chairs a month.
Fixed-term temporary workers average 75 chairs a month while learning the jigs, earning the same 7.04 million VND monthly wage plus a 5.0 million VND upfront recruitment and onboarding cost per person (with zero severance when fixed-term contracts expire). Outside subcontracting costs 135,000 VND per chair (the main shop supplies cut timber blanks and hardware; the partner workshop takes up to 800 chairs a month). Building standard chairs ahead of peak months adds 6,000 VND per chair per month for storage, insurance and humidity protection, inside an 800-chair warehouse cap.
| Capacity lever | Unit cost per finished chair | Hard operational ceiling |
|---|---|---|
| Core permanent crew, regular hours | 80,000 VND | Maximum 1,760 chairs/month (20 carpenters) |
| Internal overtime (150% rate) | 120,000 VND | Maximum 352 chairs/month (20% overtime cap) |
| Temporary worker, 1-month contract | 160,533 VND | 75 chairs/month; carries full 5m VND hiring cost |
| Temporary worker, 2-month contract | 127,200 VND | 5m VND hiring cost amortised over 2 months |
| Temporary worker, 3-month contract | 116,089 VND | 5m VND hiring cost amortised over 3 months |
| Temporary worker, 4-month contract | 110,533 VND | 5m VND hiring cost amortised over 4 months |
| External subcontracting | 135,000 VND | Partner capacity capped at 800 chairs/month |
| Pre-building in regular hours + storage | +6,000 VND/month held | Finished-goods store capped at 800 chairs |
Three clean decision thresholds emerge straight from that table. For standard catalogue chairs with steady demand, using spare regular hours in months 1 and 2 to build stock held for one to three months (86,000–98,000 VND all-in) saves 22,000 to 34,000 VND per chair against peak overtime (Slack et al., 2022, ch. 11).
Once storage bays fill up, surge duration picks the next lever: for a one-month spike, subcontracting (135,000 VND) beats a one-month temp (160,533 VND). Across surges lasting two months or longer (break-even at 1.62 months), temps undercut subcontracting; from three months onward (break-even at 2.55 months), temp unit cost drops below the 120,000 VND overtime rate as well.
Comparing chase, level and hybrid schedules across the six-month cycle
Inside the factory Planning sequence: aggregate plan, MPS, MRP, scheduling, aggregate planning fixes the 6-to-18-month capacity envelope upstream of the master production schedule (MPS), material requirements planning (MRP) and ERP shopfloor dispatch (Slack et al., 2022, chs 10, 11, 14). Running all four classic Aggregate planning strategies across our six-month demand curve exposes wide gaps in cash outlay and feasibility (Chopra, 2019, ch. 8):
- Chase demand: Swinging permanent headcount each month (16, 18, 22, 28, 32 and 19 carpenters) incurs 950.4m VND in wages plus 80.0m VND in hiring (16 hires × 5m) and 136.0m VND in severance (17 layoffs × 8m), totalling 1,166.4 million VND while eroding morale and craft retention (Chopra, 2019, ch. 8).
- Pure level capacity: Holding 23 permanent workers throughout (3 upfront hires at 15.0m VND, 971.5m VND wages and 27.6m VND storage) looks cheap on paper at 1,014.1 million VND, yet fails physically in month 3 when closing stock reaches 1,272 chairs — 59 per cent above the 800-chair warehouse ceiling.
- Spreadsheet heuristic hybrid: Keeping 20 permanent workers on full regular hours in months 1–3 banks 360, 620 and 480 chairs (safely below 800), adds 160 overtime chairs in month 4, and covers month 5 with 352 overtime chairs plus 688 subcontracted chairs. Total cost lands at 1,007.9 million VND (844.8m payroll, 8.8m storage, 61.4m overtime and 92.9m subcontracting) with every cap respected.
- Optimised hybrid (MILP): Exploiting the four-month temp rate, a mixed-integer linear solver hires 2 seasonal workers from month 2 through month 5 (56.3m wages + 10.0m hiring = 66.3m VND), pairs them with 248 overtime chairs in month 4 and 352 in month 5 (72.0m VND) plus storage (14.7m VND), cutting total cost to 997.8 million VND with zero subcontracting.
| Month | Demand (chairs) | 20 core staff (chairs) | 2 seasonal temps (chairs) | Overtime (chairs) | Closing stock (chairs) |
|---|---|---|---|---|---|
| 1 | 1,400 | 1,760 | 0 | 0 | 360 |
| 2 | 1,500 | 1,760 | 150 | 0 | 770 |
| 3 | 1,900 | 1,760 | 150 | 0 | 780 |
| 4 | 2,400 | 1,760 | 150 | 248 | 538 |
| 5 | 2,800 | 1,760 | 150 | 352 | 0 |
| 6 | 1,600 | 1,600 | 0 | 0 | 0 |
Comparing the feasible totals (1,166.4m VND chase versus 1,007.9m VND Excel hybrid and 997.8m VND MILP), the standout operational takeaway in my view is the slender 1.0 per cent gap (10.1m VND) between an ordinary spreadsheet and formal optimisation. Mid-sized manufacturers capture 99 per cent of available savings simply by tabulating true unit marginal costs and hard warehouse caps cleanly in Excel.
Sensitivity tests: why warehouse floor space matters more than unit holding fees
Varying one parameter at a time inside the MILP model reveals which physical constraints actually move the bottom line:
| Sensitivity scenario | Optimal six-month cost (VND m) | Change vs baseline |
|---|---|---|
| Baseline workshop parameters | 997.8 | 0.0% |
| Monthly holding fee raised 3.3x to 20,000 VND/chair | 1,027.8 | +3.0% |
| Monthly holding fee set to zero | 983.1 | -1.5% |
| Seasonal temporary workers unavailable | 1,005.2 | +0.7% |
| Temp recruitment fee raised to 12m VND/worker | 1,005.2 | +0.7% |
| Warehouse floor capacity tightened to 300 chairs | 1,035.6 | +3.8% |
| Warehouse floor capacity expanded to 1,500 chairs | 995.7 | -0.2% |
Two practical conclusions stand out. First, if seasonal labour shortages push temp hiring costs up to 12.0 million VND per worker, the optimal schedule drops temps altogether and covers month 5 via overtime and subcontracting at 1,005.2 million VND (+0.7%). Second, physical storage space bites harder than unit holding charges: shrinking the store from 800 to 300 chairs raises total cost by 3.8 per cent, worse than multiplying monthly holding fees 3.3 times (+3.0%), because tight floor space blocks early standard-hour stock building (Slack et al., 2022, ch. 11).
A three-step Excel capacity workflow for SME operations leads
Building a rolling 6-to-12-month seasonal plan in a real factory comes down to three disciplined checks:
- Compute all-in marginal cost per finished unit across every lever: include agency fees, early timber scrap during temp onboarding, night-shift allowances and two-way lorry freight to subcontractors.
- Enter non-negotiable legal and physical ceilings first: statutory overtime limits, usable pallet bays excluding forklift aisles and vetted monthly partner capacity that meets finish standards.
- Stack levers in marginal-cost order against surge length: fill regular hours early on standard SKUs where dry storage exists, sign fixed-term seasonal workers when peaks span two to four months, and hold subcontracting as an overflow valve for the sharpest peak month (Slack et al., 2022, ch. 11).
Foundations in Chopra and Slack, plus four shopfloor risks outside the MILP model
The four medium-term capacity archetypes (chase, workforce time flexibility, level and hybrid) follow chapter 8 of Chopra (2019) and chapter 11 of Slack et al. (2022), alongside the planning hierarchy linking aggregate capacity to MPS and MRP in chapters 10 and 14 (Chopra, 2019, ch. 8; Slack et al., 2022, chs 10, 11, 14).
Before committing cash to the 997.8 million VND MILP schedule, plant managers should build contingencies around four shopfloor realities omitted from deterministic linear models. Export furniture forecasts shift whenever buyers delay vessel bookings or revise finishes, and newly hired seasonal staff rarely hit 75 chairs a month in week one without extra rework.
On external machining and stock holding, a 135,000 VND subcontract piece-rate excludes the staff hours needed to station your own quality inspector at the partner workshop before lacquering. Storing hundreds of wooden chairs across humid monsoon months also requires dry, ventilated bays to prevent warping or finish bloom, alongside the working-capital interest cost tied up in early inventory.
Quick questions
How does aggregate planning differ from the master production schedule (MPS)?
Aggregate planning sets overall plant capacity across a 6-to-18-month horizon via core headcount, overtime limits, subcontracting and stock buffers. The master production schedule (MPS) disaggregates that envelope into weekly build quantities for specific SKUs (Slack et al., 2022, chs 10, 11; Chopra, 2019, ch. 8). If the aggregate plan exceeds physical shopfloor limits, weekly SKU schedules underneath will inevitably slip.
Do small and mid-sized factories need linear-programming software to plan seasonal capacity?
No. Across a six-month schedule with four capacity levers, ranking options by unit marginal cost in a standard spreadsheet lands within 1.0 per cent of a mixed-integer linear programme (MILP). Accurate unit cost accounting and honest physical caps matter far more than solver software.
Where should an operations lead set the monthly overtime ceiling?
The 20 per cent overtime cap in our worked case is an illustrative guard against joinery defects and fatigue. In a live plant, bind the spreadsheet first to statutory labour-code limits and collective agreements; volume above that legal ceiling shifts automatically to fixed-term seasonal contracts or vetted subcontractors.
How does the capacity mix change for made-to-order workshops that cannot hold finished stock?
In bespoke joinery or fast-moving fashion where finished items cannot be built ahead of orders, early trough-month stock buffers are ruled out (Slack et al., 2022, ch. 11). Without pre-built inventory, peak months must rely on seasonal contracts paired with maximum legal overtime; in our furniture model, removing early stock raises minimum six-month cost from 997.8m VND to roughly 1,070m VND (around 7 per cent higher).
References
Listed A–Z by author surname, Harvard style. A source with a DOI links to https://doi.org/…; one without links to its page or says plainly that it has no DOI.
- Chopra, S. (2019) Supply chain management: strategy, planning, and operation (7th global edn). Harlow: Pearson.No DOIpearson.comCited in 4 articles
- Slack, N., Brandon-Jones, A. and Burgess, N. (2022) Operations Management (10th edn). Harlow: Pearson.No DOIpearson.comCited in 3 articles