Choosing a plant or warehouse: criteria and break-even
Adding a regional hub cuts transport lanes from m × n to m + n, yet below 719 pallets a month in our coatings check, fixed rent wipes out the freight saving. Here is how to run the pallet break-even test, score five site criteria against staying put and apply Chopra's four-phase funnel.

Suppose an architectural coatings manufacturer runs two plants in Long An and Binh Duong, shipping less-than-truckload (LTL) orders straight to 15 building-materials merchants across the Mekong Delta at high pallet rates and three-day lead times. Sales wants a leased Vinh Long hub for 24-hour delivery, whereas finance balks at fixed monthly rent during uneven construction demand. Pairing Chopra's (2019) distribution economics with Slack and colleagues' (2022) appraisal rules sets a clear test: open a regional warehouse only when slump-season throughput clears pallet break-even and beats the baseline of staying put (Chopra, 2019; Slack et al., 2022, ch. 5).
Direct shipping versus a regional warehouse: calculating the 719-pallet break-even
Adding an intermediate warehouse inside a Direct shipping or distributor warehouse network cuts transport lanes from m × n to m + n, saving money only above the monthly pallet volume where consolidated freight savings exceed fixed hub overheads (Chopra, 2019).
On pure lane count, m factories shipping direct to n merchants manage m × n separate links, whereas routing through one shared depot leaves m inbound trunk legs plus n local delivery runs (m + n). Across 2 plants and 15 paint merchants (assuming both plants supply the full range), direct despatch coordinates 30 lanes while a Vinh Long hub trims the network to 17 lanes.
Direct plant shipping keeps working capital lean: pooling finished stock at two factories absorbs demand swings across all 15 merchants with minimal safety stock (Chopra, 2019). Its drawback is pricey long-haul LTL freight; leasing a regional hub enables cheap full-truckload (FTL) trunking into Vinh Long followed by mixed local drops, at the price of funding buffer inventory across two tiers (Chopra, 2019).
Run the monthly break-even check on the illustrative coatings figures:
- Direct LTL delivery from the factories averages VND 600,000 per pallet.
- Routing via Vinh Long costs VND 150,000 per pallet in FTL inbound trunking plus VND 290,000 per pallet in local van drops, totalling VND 440,000 per pallet in variable freight (saving VND 160,000 per pallet).
- Monthly fixed hub overheads combine VND 90m in rent, power, security and storekeepers with VND 25m in extra buffer-stock financing and forklift handling, totalling VND 115m a month.
- Monthly break-even volume (Q*): Q* = VND 115,000,000 / VND 160,000 ≈ 719 pallets / month
| Monthly throughput (pallets) | Direct shipping spend | Via Vinh Long hub | Monthly net variance | Operational verdict |
|---|---|---|---|---|
| 600 | VND 360.0m | VND 379.0m | Hub costs VND 19.0m more | Negative operating leverage below break-even |
| 719 | VND 431.4m | VND 431.4m | VND 0.0m | Exact freight-versus-rent break-even |
| 720 | VND 432.0m | VND 431.8m | Hub saves VND 0.2m | Wafer-thin cost surplus |
| 900 | VND 540.0m | VND 511.0m | Hub saves VND 29.0m (5.4%) | Clear cost saving plus 24-hour merchant delivery |
| 1,000 | VND 600.0m | VND 555.0m | Hub saves VND 45.0m (7.5%) | Strong warehouse scale economies |
At 900 pallets a month, leasing the Vinh Long depot trims VND 29m off monthly distribution bills while cutting delivery times to 24 hours. Yet a 20 per cent wet-season construction slowdown to 720 pallets wipes out virtually the entire cost advantage.
In my view, judging a warehouse lease on peak-quarter volume is the most common trap in distribution planning: stress-test whether trough-month throughput stays above 719 pallets before committing to fixed rent. For slow-moving, high-value specialist tints, Chopra advises holding inventory centralised at the plant and shipping direct on order (Chopra, 2019).
Five site-appraisal criteria and how strategic weights flip the winning option
Where cash preservation competes with delivery speed, Slack and colleagues' Five groups of location criteria scores candidates across five criteria groups against the mandatory baseline of staying put (Slack et al., 2022, ch. 5).
| Criteria group | Practical checks on the ground |
|---|---|
| Capital requirements | Land purchase or lease deposits, slab reinforcement, fire systems, racking and relocation capex |
| Market factors | Merchant replenishment lead times, regional brand presence and local warehouse labour supply |
| Cost factors | Inbound trunking, local drop rates, handling wages, three-phase power and local tax charges |
| Future flexibility | Room to expand bays, route adaptability if suppliers shift and early lease break clauses |
| Risk factors | Cutover order disruption, customer defection during migration, rent review spikes and site security |
Slack and colleagues flag two recurring mistakes in site appraisals: inspecting a single property without alternatives and omitting the status quo (Slack et al., 2022, ch. 5). Every warehouse launch consumes management bandwidth and risks mis-picks during cutover weeks.
Score the coatings maker's three options from 1 to 5 (higher is better; cost scores assume 900 pallets a month): Option A stays put with direct plant shipping, Option B leases the Vinh Long regional hub and Option C rents a consolidation shed beside the Long An plant.
| Criteria group | Option A: Stay put | Option B: Vinh Long hub | Option C: Long An shed | Set 1 weights (market speed) | Set 2 weights (cash defence) |
|---|---|---|---|---|---|
| Capital requirements | 5 | 3 | 3 | 20% | 35% |
| Market factors | 2 | 5 | 3 | 25% | 10% |
| Cost factors | 2 | 4 | 4 | 25% | 25% |
| Future flexibility | 4 | 3 | 4 | 15% | 15% |
| Risk factors | 4 | 3 | 3 | 15% | 15% |
| Weighted score (Set 1) | 3.20 | 3.75 | 3.40 | Winner: Option B | |
| Weighted score (Set 2) | 3.65 | 3.45 | 3.40 | Winner: Option A |
Holding raw scores untouched while shifting weights from merchant speed (Set 1) to cash defence (Set 2) flips the winning decision from opening Vinh Long (3.75) back to staying put (3.65). I use weighted scorecards to force alignment upfront: Slack and colleagues provide the five headings (Slack et al., 2022, ch. 5), while agreeing the weights settles whether the board is funding market share or protecting cash reserves this year.
Chopra's four-phase location funnel: why viewing plots comes last
Chopra's Location funnel: from strategy to site sequences network design across four narrowing stages so teams stop touring cheap warehouse listings before deciding how the supply chain competes (Chopra, 2019).
- Phase 1 (Supply-chain strategy): Fix whether the business competes on lowest landed cost or rapid replenishment, and decide which tasks stay internal versus third-party logistics (
3PL) (Chopra, 2019); see our guide to efficient and responsive supply chains. - Phase 2 (Regional configuration): Combine regional demand forecasts, tax rules and target merchant lead times to set how many facilities to operate and at what capacity (Chopra, 2019).
- Phase 3 (Candidate site screening): Filter industrial zones or hubs on hard infrastructure (expressways, inland barge wharves, three-phase power, drainage, heavy-lorry turning yards) and local labour conditions (Chopra, 2019).
- Phase 4 (Specific plot selection): Price carrier tariffs, lease terms and local taxes site by site to pick the plot delivering the strongest net return (Chopra, 2019).
Chopra also separates asset horizons clearly: owned factories lock capital down for ten years or more behind civil works and environmental permits, whereas leased warehouses normally permit exit or relocation within one to two years (Chopra, 2019).
Four distribution realities that pure pallet break-even maths leaves out
Chopra's Supply Chain Management (2019, chapters 4–5) anchors the four-phase funnel and multi-echelon freight model, while Slack, Brandon-Jones and Burgess's Operations Management (2022, chapter 5) provides the five site-criteria groups and stay-put baseline (Chopra, 2019; Slack et al., 2022, ch. 5). Putting those equations to work in provincial distribution requires checking four real-world variables.
Road haulage rates swing with fuel, tolls and return backhaul cargo. Treating pallet rates as constant misses how Vietnamese carriers price routes: lorries able to load Mekong agricultural produce back to Ho Chi Minh City quote far keener southbound pallet tariffs than vans returning empty.
Cost-only break-even equations omit protected gross margin from faster replenishment. Weighing rent against lorry bills ignores revenue retention; cutting merchant lead times from three days to 24 hours stops stockists switching to rival paint brands on urgent contractor orders.
Specialist compliance fit-outs can turn a short warehouse lease into heavy sunk capex. Although Chopra treats leased depots as reversible (Chopra, 2019), storing architectural coatings and solvents often requires chemical-grade fire protection, sealed floor slabs and heavy racking that cannot be recovered on exit.
Finally, expressway openings and urban lorry curfews redraw regional lead times mid-lease. New Mekong expressway sections or revised inner-city tonnage windows can shift the 719-pallet threshold within two or three years. All pallet tariffs and scores above are illustrative; plug in live carrier quotes and vet warehouse partners using evaluating suppliers: the seven Cs and total cost.
Quick questions
How does leasing a regional warehouse compare with building a plant on reversibility?
Chopra (2019) notes that company-built factories typically anchor capital for ten years or more behind civil foundations, permits and heavy machinery, whereas a leased warehouse can be exited or shifted within one to two years (Chopra, 2019). That reversibility vanishes if a tenant signs a punitive multi-year lock-in or sinks unrecoverable cash into specialist fire suppression and bespoke racking.
How should leadership teams assign weights across the five location criteria?
Slack and colleagues (2022) define the five criteria groups while leaving exact weights to competitive strategy (Slack et al., 2022, ch. 5). Cost-led manufacturers weight capital outlays and operating tariffs heavily, whereas rapid-replenishment suppliers prioritise market proximity. Asking sales, operations and finance directors to submit weights independently before meeting surfaces hidden trade-offs quickly.
Does the m + n versus m × n route reduction formula hold across every network?
Only when every plant manufactures the full SKU range and all regional orders pass through one shared hub. Product-specific factories or multiple depots add extra transport legs; treat the formula as an initial consolidation check before pricing actual carrier lanes.
When is staying put better than opening a new warehouse or relocating?
Slack and colleagues (2022) require benchmarking every site proposal against the status quo because cutover disruption, relocation bills and lost orders during transition are routinely underpriced (Slack et al., 2022, ch. 5). Commit to a new facility only when net savings comfortably clear transition costs even during off-peak demand.
References
Listed A–Z by author surname, Harvard style. A source with a DOI links to https://doi.org/…; one without links to its page or says plainly that it has no DOI.
- Chopra, S. (2019) Supply chain management: strategy, planning, and operation (7th global edn). Harlow: Pearson.No DOIpearson.comCited in 4 articles
- Slack, N., Brandon-Jones, A. and Burgess, N. (2022) Operations Management (10th edn). Harlow: Pearson.No DOIpearson.comCited in 3 articles