---
title: "Kotter's Eight Steps for Small Firms: What Works"
description: "How to adapt Kotter's eight steps for a 20-person firm: drop committee overhead, keep eight core checks and run parallel cycles per Pollack and Pollack."
url: "https://khoi.co.uk/blog/kotter-cong-ty-hai-muoi-nguoi"
lang: en-GB
author: "Le Quoc Khoi"
date: 2026-11-03
updated: 2026-11-26
topics: ["Change management"]
tags: ["John Kotter", "Change management", "Small business", "Guiding coalition"]
---

# Kotter in a twenty-person firm: what survives?

## Key takeaways

- Drawing on observations of over 100 corporate turnarounds, John Kotter (1995) argued that major change progresses through eight linked stages; skipping steps creates false speed and serious missteps in any phase undermine momentum (Kotter, 1995).
- Tracking a two-year intervention inside an Australian financial services and insurance enterprise of over 10,000 staff, Pollack and Pollack (2015) found the eight steps effective at local group level once split into asynchronous parallel cycles (Pollack and Pollack, 2015).
- Appelbaum and colleagues' (2012) review, cited by Pollack and Pollack, notes that Kotter's sequence lacks independent control-group datasets and works best as a structured practitioner risk checklist (Pollack and Pollack, 2015).
- Adapted for a 20-person SME: retain all eight governance questions, eliminate steering-committee overhead and vest openly known operating authority in three daily decision-makers.

Does a twenty-person commercial print shop moving off handwritten pads and personal chat messages need steering committees, thirty-page vision decks and town-hall launches as [Kotter's eight steps](https://khoi.co.uk/framework/kotter-8-steps) are often taught in corporate programmes? When the entire payroll fits around two lunch tables, enterprise ceremony wastes production hours. Yet owners who buy cloud software on Friday and mandate adoption on Monday without addressing authority, workflow blockers and unspoken shopfloor habits routinely watch staff revert to old workarounds within weeks (Kotter, 1995).

## Translating Kotter's eight steps for a twenty-person workshop

In an SME, Kotter's eight stages (urgency, guiding coalition, vision and strategy, communication, obstacle removal, short-term wins, consolidating gains and cultural anchoring (Kotter, 1995; Pollack and Pollack, 2015)) have to compress into direct daily operating rules.

> **Figure:** [Kotter's eight-step change model](https://khoi.co.uk/framework/kotter-8-steps) (Kotter's eight-stage change process, redrawn)

Take an illustrative twenty-person commercial packaging print shop employing the owner, one production foreman, one order coordinator, two administrative bookkeepers and 15 press operators across two shifts. Last quarter, 14 out of 120 print jobs (11.7 per cent) ran late or suffered spec misprints because artwork revisions arrived scattered across private chat apps, phone calls and paper notebooks.

Scrapped board stock, remade plates and late penalties cost VND 1.8 million per spoilt order, totalling VND 25.2 million in direct quarterly waste. Adopting cloud order software at VND 750,000 per month (VND 2.25 million per quarter) plus VND 6.0 million upfront for barcode scanners and label printers pays back inside six months if it prevents just four spoilt jobs per quarter.

| Stage in Kotter's model | Core principle in the literature | Lean shopfloor rule in a 20-person print shop |
|:--|:--|:--|
| 1. Establish urgency | Complacency is the primary blocker; Kotter estimates at least 75 per cent of managers must view the status quo as untenable (Kotter, 1995; Pollack and Pollack, 2015) | Tie [sense of urgency](https://khoi.co.uk/glossary#sense-of-urgency) to hard workshop numbers: post last quarter's 14 spoilt jobs and VND 25.2m rework bill beside the presses, linked directly to the quarterly team bonus pool |
| 2. Form a guiding coalition | Assemble formal authority, technical skill, floor credibility and operational reach (Kotter, 1995; Pollack and Pollack, 2015) | Focus the [guiding coalition](https://khoi.co.uk/glossary#guiding-coalition) on three explicit roles: the owner (budget and rule enforcement), the foreman (press-line credibility) and the order coordinator (daily system operator) |
| 3. Vision and strategy | Express the target state in under five minutes alongside crisp operating rules (Kotter, 1995) | Set one verifiable standard: "100 per cent of press runs carry a single barcoded job ticket". Enforce three rules: zero orders via private chat, zero press starts without a barcode and immediate defect logging |
| 4. Communicate the vision | Executives routinely under-communicate change rules by a factor of 10 to 100 (Pollack and Pollack, 2015) | Run ten-minute stand-ups beside the presses each morning; when longstanding clients phone the owner directly, the owner routes every request through the coordinator's ticket queue first |
| 5. Remove structural obstacles | Eliminate conflicting incentives, procedural friction or leadership habits blocking the new routine (Kotter, 1995; Pollack and Pollack, 2015) | Curb the owner's own verbal rush-order habit via one physical gate at the paper store: zero board stock leaves the rack without a printed system barcode |
| 6. Generate short-term wins | Produce visible, unambiguous early gains tied directly to the new workflow (Kotter, 1995; Pollack and Pollack, 2015) | Target a two-week [short-term win](https://khoi.co.uk/glossary#short-term-win): 14 consecutive working days with zero misprints from missing specs, paid out immediately as a cash shift bonus |
| 7. Consolidate gains | Avoid declaring victory prematurely; use early credibility to tackle deeper upstream habits (Kotter, 1995; Pollack and Pollack, 2015) | Run barcoded job tickets cleanly for six full weeks before activating automated quoting and paper-inventory deduction so operators are never swamped |
| 8. Anchor in culture | New practices stay fragile until embedded in hiring, onboarding and reward routines (Kotter, 1995; Pollack and Pollack, 2015) | Build barcode ticket verification into apprentice induction checklists and tie quarterly error-free job rates into permanent bonus reviews |

Stages two and four carry the heaviest weight in a twenty-person business. Small workshops need zero committee minutes, yet everyone on the floor must know openly which three people hold the mandate to release or halt a press run. At stage four, behaviour outranks speeches: if a favoured buyer rings at 16:30 on Friday and the owner waves an unticketed rush job onto the press, shopfloor compliance evaporates by Monday morning.

## Handling split adoption speeds with Pollack and Pollack's parallel cycles

Pollack and Pollack's (2015) sharpest empirical contribution demonstrates that Kotter's eight stages rarely advance as one uniform company-wide march (Pollack and Pollack, 2015). Studying a two-year knowledge-management rollout inside an Australian financial services and insurance group of over 10,000 staff, the change team had to manage multiple overlapping eight-step cycles because separate units progressed at markedly different speeds (Pollack and Pollack, 2015).

Ten months into the corporate programme, a layer of middle managers five reporting tiers beneath the CEO still saw no operational reason to alter how specialist knowledge was recorded (Pollack and Pollack, 2015). Leaving faster departments moving ahead, the team opened a dedicated cycle back at stage one for that group: bringing senior sponsors down to explain retirement-loss risks, forming a local coalition and translating generic programme goals into weekly team tasks (Pollack and Pollack, 2015).

Small workshops experience the exact same velocity split across roles. Three weeks into our print-shop rollout, the coordinator and bookkeepers may reach stage six enthusiastically because digital tickets eliminate end-of-month reconciliation headaches. Simultaneously, two veteran press operators stay anchored at stage one, suspecting barcode scans were bought to police tea breaks.

When I advise SMEs rolling out ERP or order-tracking tools, addressing that pocket of hesitation means opening a tailored stage-one conversation built around the operators' own press-line pain rather than issuing top-down warnings. Reviewing shift logs together reveals presses sitting idle for 45 minutes a week while operators chase missing lamination specs from illegible notes—downtime that cuts directly into shift output bonuses. Once senior operators see barcoded tickets protecting machine uptime and shift pay, floor resistance subsides (Pollack and Pollack, 2015).

## Four situations where small firms should skip Kotter's eight steps

Kotter's framework earns its keep when change alters cross-role handovers across sales intake, prepress, stores and production. Set the eight steps aside in four distinct situations:

| Operational situation | Why Kotter's eight-step model misfires | Sharper diagnostic or execution tool |
|:--|:--|:--|
| Single-person tool upgrades (such as one bookkeeper switching payroll templates) | Zero cross-team handover friction exists; forming coalitions and morning huddles creates needless overhead | Agree output accuracy standards one-to-one and fund short technical training |
| Pushback rooted in commission cuts, piece-rate reductions or broken pay promises | Process urgency and communication campaigns cannot repair direct economic loss or breached trust | Renegotiate transparent pay terms first; diagnose root grievances via [Kanter's ten reasons people resist change](https://khoi.co.uk/blog/muoi-ly-do-khang-cu-kanter) and [four theories of resistance](https://khoi.co.uk/blog/bon-ly-thuyet-khang-cu-thay-doi) |
| Declared rules clashing with unspoken shopfloor reward norms | Staff follow what actually earns praise or overtime on the floor over wall posters | Audit underlying assumptions through [Schein's three levels of culture](https://khoi.co.uk/blog/ba-tang-van-hoa-schein) before buying software |
| Coaching individual skill gaps or assigning floor-level rollout roles | Kotter addresses organisational momentum at group level without person-by-person coaching steps | Pair enterprise sequencing with [choosing between ADKAR, Kotter and Lewin](https://khoi.co.uk/blog/adkar-kotter-lewin-chon-mo-hinh) and role design in [three change-champion roles](https://khoi.co.uk/blog/champion-thay-doi-ba-vai-tro) |

## Going deeper: Kotter's 1995 origins and empirical boundaries

John Kotter introduced the eight-stage model in his 1995 *Harvard Business Review* essay synthesising observations across more than 100 corporate restructuring, quality and turnaround efforts (Kotter, 1995), expanding the argument in his 1996 book *Leading Change* (Kotter, 1996; Pollack and Pollack, 2015). His original essay noted that only a handful of corporate transformations succeeded outright, a few failed completely and most clustered towards the disappointing lower end of the middle (Kotter, 1995).

Academic scrutiny centres on evidentiary method. Citing Appelbaum and colleagues' (2012) systematic review, Pollack and Pollack point out that Kotter published neither raw datasets nor controlled comparisons, building the sequence primarily from personal advisory experience (Pollack and Pollack, 2015). Its durability across business schools and boardrooms rests on clear operational sequencing rather than controlled statistical proof.

Pollack and Pollack (2015) contributed rare longitudinal field evidence over two years of live corporate delivery, though two clear scope limits govern how far SMEs can generalise their findings (Pollack and Pollack, 2015). Their data came from a single Australian financial services and insurance enterprise of more than 10,000 employees with deep white-collar management tiers—worlds apart from a flat twenty-person workshop in Vietnam. One co-author also served simultaneously as academic researcher and internal change manager on the project (Pollack and Pollack, 2015), introducing insider observer risk when judging outcomes. In practice, I treat Kotter's eight stages as a pre-launch governance checklist to catch missing authority or perverse storehouse rules early, never as a mechanical guarantee.

## Frequently asked questions

### Does a twenty-person business really need all eight of Kotter's steps?

It needs answers to all eight governance questions while stripping away committee paperwork. Kotter warned that skipping phases creates an illusion of speed that unravels workflow adoption later (Kotter, 1995). Inside a twenty-person firm, the eight steps translate into ten-minute shift stand-ups and clear physical handoff rules.

### Who belongs in the guiding coalition of a 20-person SME?

Three operational roles holding real authority and shopfloor respect suffice: the business owner (budget and policy discipline), the production foreman (technical credibility with operators) and the order coordinator who drives the new system daily (Pollack and Pollack, 2015).

### Must Kotter's eight steps run in one strict linear sequence across the firm?

Live rollouts rarely march in a single column. Pollack and Pollack's (2015) field study showed separate teams moving through the stages at uneven speeds, requiring overlapping parallel cycles (Pollack and Pollack, 2015). Front-office staff may celebrate early wins at step six while veteran press operators remain unconvinced back at step one.

### How strong is the independent empirical evidence behind Kotter's model?

Independent statistical validation remains limited. Pollack and Pollack cite Appelbaum and colleagues' (2012) literature review showing that most supporting material stems from Kotter's own consulting syntheses and that the framework spread largely through practical clarity (Pollack and Pollack, 2015).

## References

- Kotter, J.P. (1995) *Leading change: why transformation efforts fail*. Harvard Business Review. Available at: https://hbr.org/1995/03/leading-change-why-transformation-efforts-fail-2 (Accessed: 2026-11-01).
- Kotter, J.P. (1996) *Leading Change*. Boston, MA: Harvard Business School Press.
- Pollack, J. and Pollack, R. (2015) ‘Using Kotter's eight stage process to manage an organisational change program: presentation and practice’, *Systemic Practice and Action Research*, 28(1), pp. 51–66. https://doi.org/10.1007/s11213-014-9317-0

---

Canonical HTML version: https://khoi.co.uk/blog/kotter-cong-ty-hai-muoi-nguoi

> A personal blog by Le Quoc Khoi, not affiliated with, sponsored or reviewed by the University of Greenwich. “Greenwich” and “University of Greenwich” are names belonging to their respective owners. No copyrighted study materials are published here; theory and cases are retold in the author's own words and may not be fully accurate, so check the original sources.
