---
title: "Evaluating change: what to measure and when"
description: "How to evaluate workflow changes before, during and after in an SME: building baselines from existing records and using Scale–Modify–Stop gates."
url: "https://khoi.co.uk/blog/danh-gia-thay-doi-truoc-trong-sau"
lang: en-GB
author: "Le Quoc Khoi"
date: 2026-11-03
updated: 2026-11-26
topics: ["Change management"]
tags: ["Change management", "Change evaluation", "Baseline", "Performance measurement", "Decision gate"]
---

# Evaluating change before, during and after

## Key takeaways

- Park (2017) structures change evaluation across pre-intervention, intra-intervention and post-intervention phases, noting that review cycles can repeat across complex programmes (Park, 2017).
- Rist et al. (2011) map evaluation into baseline, midterm, final and long-term impact stages (Rist et al., 2011, p. 173); adding measurement after launch routinely leaves projects without a systematic baseline (Rist et al., 2011, p. 174).
- Public-sector evidence illustrates the risk: three years into Sri Lanka's results-based management drive, many ministries still lacked baseline numbers for their own stated targets (Rist et al., 2011, p. 19).
- In an illustrative 25-person packaging printer, median ticket turnaround rises from 20 to 26 hours at Week 6 during a transition dip before dropping to 14 hours at Week 12, saving roughly VND 24m a month in reprints; sales entry time of 22 hours misses its 20-hour cap and triggers a Modify decision.
- The Scale–Modify–Stop gate locks baseline metrics at milestone M1, pairs speed with quality at M4, and enforces a binding scale, modify or stop call at M5.

Overhauling an order-intake workflow or rolling out a CRM and asking supervisors three months later whether errors have fallen produces vague reassurance when no starting numbers exist. Without a pre-change baseline, an owner-manager cannot tell whether the new routine cut shop-floor rework or merely shifted unpaid data-entry hours onto the sales desk. Pairing [Three-phase evaluation of change](https://khoi.co.uk/framework/change-evaluation-three-phases) with the pre-committed thresholds of [Scale–modify–stop gate for AI adoption](https://khoi.co.uk/framework/gated-ai-adoption) lets an SME track hard unit economics across each phase and make rollout decisions on verified operating records.

## What belongs on an SME change-evaluation scorecard?

A practical SME change scorecard needs five items for every indicator: an explicit numerator-and-denominator formula, an existing record source with one accountable owner, a four-to-eight-week baseline, pre-agreed Scale–Modify–Stop thresholds and observed midterm and final readings:

| Scorecard column | Recording standard | Application at a packaging print shop |
|:--|:--|:--|
| Indicator and formula | Countable metric with unambiguous start and stop triggers | Median hours from initial customer order message to approved press ticket |
| Data source and owner | Pulled from existing operating records; one person accountable | Zalo message timestamps and job tickets; order coordinator responsible |
| Baseline | Pre-change figure, observation window and order count | 20 hours, logged across 4 consecutive weeks covering 380 orders |
| Decision thresholds | Written down before post-change numbers are inspected | Scale if ≤ 16 hours; Modify if 17–20 hours; Stop if > 20 hours |
| Midterm and final readings | Actual numbers, mid-course workflow fixes and gap to baseline | Checked at Week 6 (midterm) and signed off at Week 12 (final) |

On indicator selection, Rist et al. (2011) cite the World Bank's (2007) four-level training evaluation model, progressing from participant reaction up to organisational impact measured against baseline performance (Rist et al., 2011, p. 182). In my view, an SME workflow pilot stays sharpest at five metrics split across three buckets: three commercial outcomes (turnaround time, rework defects), one operational friction measure (staff hours spent keying data) and one frontline compliance rate. Tracking form completion while ignoring rework cost or clerical hours mistakes administrative compliance for economic ROI.

Across private workshops and public agencies alike, baselines vanish for three predictable reasons. Impatient sponsors push for shop-floor action the Monday after sign-off and skip logging four weeks of current error rates; monitoring and evaluation get bolted on midstream after launch, leaving projects without a systematic starting benchmark (Rist et al., 2011, p. 174); and legacy paperwork seldom matches new output targets, as seen in Sri Lanka's results-based management programme where ministries still lacked baseline figures three years in because historic ledgers had never tracked target outcomes (Rist et al., 2011, p. 19).

Capturing four to eight weeks of baseline data (spanning both quiet mid-month days and month-end dispatch rushes) requires zero extra forms when pulled straight from existing chat timestamps, job dockets and delivery notes.

## How before, during and after evaluation differs from weekly monitoring

Change evaluation takes place at three deliberate milestones (before launch, midway through transition and once habits settle) to test whether the intervention design works as intended beyond routine weekly output targets. Park (2017) terms these stages pre-intervention, intra-intervention and post-intervention evaluation, noting that iterative projects may cycle through them repeatedly (Park, 2017); Rist et al. (2011) organise the equivalent public-programme sequence into baseline, midterm, final and impact evaluations (Rist et al., 2011, p. 173).

> **Figure:** [Three-phase evaluation of change](https://khoi.co.uk/framework/change-evaluation-three-phases) Three points of evaluation for a change (after Park, 2017; Rist et al., 2011).

Keeping routine monitoring separate from evaluation prevents wasted meetings. Under the OECD/DAC definition cited by Rist et al. (2011), monitoring collects routine progress indicators so supervisors can steer short-term execution, whereas evaluation examines an ongoing or completed project systematically and objectively across design, execution and delivered results (Rist et al., 2011, p. 172). Reviewing dispatch counts every Monday morning is monitoring; pausing at Week 6 to check whether a new digital intake ticket cut prepress errors or created a quoting bottleneck is evaluation.

## A 25-person packaging printer: reading before, midterm and week-12 numbers

Consider an illustrative 25-person packaging printer in Long An running a twelve-week pilot on its first press line to standardise customer order intake: Week 6 metrics worsen noticeably under duplicate handling before midterm fixes deliver VND 24 million a month in avoided reprint costs by Week 12.

Before the trial, buyer specifications arrived across Zalo chats, phone calls and emails; sales reps scribbled notes into personal notebooks and handed them to an order coordinator to retype into production tickets. Missing board weights, lamination finishes or colour counts triggered repeated call-backs, prepress delays and spoilt print runs. The pilot channelled every incoming job through one shared ticket with five mandatory fields (finished dimensions, run quantity, board grade, colour count and dispatch date), blocking incomplete tickets before prepress:

| Operating metric | Baseline (4 weeks, 380 orders) | Midterm (Week 6) | Final (Week 12) | Scale target |
|:--|--:|--:|--:|:--|
| Order message to approved press ticket (median hours) | 20 | 26 | 14 | ≤ 16 |
| Orders requiring technical call-back (%) | 31 | 22 | 12 | ≤ 15 |
| Defective jobs requiring reprint (per 100 orders) | 7 | 6 | 3 | ≤ 4 |
| Sales desk order-entry workload (hours/week) | 18 | 30 | 22 | ≤ 20 |
| Orders routed through shared standard ticket (%) | 0 | 70 | 96 | ≥ 90 |

Read in isolation, Week 6 looked like a step backwards: median ticket approval stretched from 20 to 26 hours while sales entry hours jumped from 18 to 30 hours a week. That deterioration reflects a textbook [performance dip in transition](https://khoi.co.uk/glossary#performance-dip), where frontline staff run shadow routines while learning unfamiliar tools: sales reps kept writing orders into paper notebooks before typing them into the shared form, and the coordinator checked optional comment boxes word for word.

Midterm evaluation at Week 6 fixed both design flaws by retiring personal notebooks in favour of single-entry tickets and restricting coordinator checks to the five mandatory fields. Where operators still cling to shadow spreadsheets or paper logs out of anxiety, diagnosing the cause through the [four theories of resistance to change](https://khoi.co.uk/blog/bon-ly-thuyet-khang-cu-thay-doi) outperforms disciplinary memos.

By Week 12, four of the five metrics cleared their scale thresholds: median approval dropped to 14 hours, call-backs fell to 12 per cent, reprints dropped from 7 to 3 per 100 jobs and ticket adoption reached 96 per cent. Across an average monthly volume of 400 orders, trimming reprints from 7 per cent (28 jobs) to 3 per cent (12 jobs) eliminated 16 spoilt runs a month; at VND 1.5 million per reprint in board, plates and press time, gross savings reached VND 24 million a month. Only weekly sales entry time remained at 22 hours, two hours above its 20-hour ceiling.

## Applying the Scale–Modify–Stop gate and checking three validity traps

Testing Week 12 numbers against the pre-committed rules of the [Scale–Modify–Stop gate](https://khoi.co.uk/framework/gated-ai-adoption) points cleanly to **Modify**, avoiding premature factory-wide rollout while preserving the gains already won. Milestone M1 fixes the baseline, milestone M4 evaluates cycle speed alongside output quality, and milestone M5 enforces a binding decision:

> **Figure:** [Scale–modify–stop gate for AI adoption](https://khoi.co.uk/framework/gated-ai-adoption) Six milestones in six months for the scale–modify–stop gate.

Under the printer's written M5 rules, **Scale** requires all five metrics to hit target; **Modify** applies when the quality guardrail (reprint defects) stays at or better than baseline and any off-target metric has improved substantially since Week 6; and **Stop** triggers if reprints exceed 7 per 100 jobs or ticket adoption falls below 50 per cent after midterm fixes.

With reprints more than halved and sales entry hours down from 30 to 22 hours, the shop executes a targeted four-week modification: auto-filling standing box specifications and tax IDs for repeat buyers, deleting two unused note fields and re-measuring before rolling the ticket onto its second label line under milestone M6. Staged gates rely on reversible pilots; single-day company-wide ERP or accounting cutovers carry prohibitive rollback costs and have to front-load verification into pre-launch parallel runs instead. Skipping M1 and M5 in software rollouts directly fuels the [ROI measurement gap](https://khoi.co.uk/glossary#roi-measurement-gap), leaving buyers unable to prove financial return after licences are deployed.

Even when Week 12 figures beat the baseline comfortably, Park (2017) warns that measurement instruments and evaluation routines can distort internal validity (Park, 2017). Before signing off plant-wide expansion, I check three practical confounders on the shop floor: seasonal volume swings (logging a baseline during pre-Tết congestion and measuring Week 12 in a quiet month flatters turnaround times unless cross-checked against prior-year calendar weeks), [selection bias](https://khoi.co.uk/glossary#selection-bias) (trialling the workflow on eager tech-savvy volunteers instead of an average crew), and the Hawthorne effect (operators working with extra care while timed closely, requiring a quiet spot check two to three months later to confirm the habit stuck).

## Going deeper: Public-sector and OD roots in Rist (2011) and Park (2017)

The three-phase evaluation framework brings together public-sector programme evaluation published by the World Bank in Rist, Boily and Martin (2011) (Rist et al., 2011, p. 9) and organisation-development intervention research synthesised by Park (2017) (Park, 2017).

Rist, Boily and Martin's (2011) edited volume establishes the institutional mechanics: Chapter 10 (pp. 171–194) separates routine operational monitoring from design-and-results evaluation, page 19 documents missing ministerial baselines in Sri Lanka, and page 9 reports the 2010 IPDET survey ranking indicator overload and absent baselines among primary monitoring failures. Complementing that macro view, Park's (2017, pp. 1–30, Productivity Press) opening chapter formalises pre-intervention, intra-intervention and post-intervention evaluation phases for organisational change while cataloguing threats to internal validity.

Translating both texts into owner-managed businesses carries two clear scope boundaries. Empirical cases in Rist et al. (2011) come from government ministries and donor-backed programmes staffed by dedicated monitoring officers, whereas cash-constrained SMEs have to keep scorecards lean at three to five indicators tied directly to spoilage cost and order cash cycle.

Neither publication presents randomised controlled trials proving that baseline scorecards or formal decision gates raise project survival rates independently of management execution. Three-phase evaluation fits bounded operational interventions with crisp launch and sign-off dates, such as introducing a shared job ticket or reorganising a press shift; where workplace routines evolve incrementally across several quarters without a clean start date, managers have to benchmark progress against reconstructed historical ledger periods.

## Frequently asked questions

### Can you still evaluate a workflow change if nobody recorded a baseline first?

Partly. Reconstruct a starting benchmark from historical operational records such as messaging timestamps, production tickets or dispatch invoices, applying the exact counting formula you will use for post-change checks and labelling the figure as reconstructed. If past paperwork is too thin, measure an untouched shift or second production line immediately as a temporary comparison group.

### How many indicators belong on an SME change-evaluation board?

Five indicators usually fit an operational pilot: three commercial outcome measures, one measure of clerical workload or direct cost, and one frontline adoption rate. A 2010 IPDET evaluation survey ranked setting too many or too few indicators alongside missing baselines among the top eight weaknesses in national monitoring systems (Rist et al., 2011, p. 9). Drop any metric whose movement would leave your management decision unchanged.

### How does a midterm evaluation differ from weekly progress monitoring?

Quoting the OECD/DAC standard, Rist et al. (2011) note that monitoring tracks routine figures at regular intervals to keep short-term execution on schedule, whereas evaluation is a systematic, objective assessment of design, implementation and results (Rist et al., 2011, p. 172). Monday morning tracking asks whether staff are keeping pace; midterm evaluation asks whether the new workflow design itself solves the operational bottleneck.

### Does the Scale–Modify–Stop gate work outside AI pilot projects?

Yes. Although drafted originally for staged AI trials, its core discipline is pairing cycle speed with output quality against an agreed baseline. That structure applies cleanly to any process change trialled on one production line, shift or regional sales pod. Whole-company cutovers executed on a single day, such as switching core accounting ledgers at year-end, leave little room for a mid-flight stop gate.

## References

- Park, M.J. (2017) ‘Why evaluate organizational change efforts?’, in *Evaluating organization development: how to ensure and sustain the successful transformation*. Productivity Press, pp. 1–30. https://doi.org/10.1201/b21877-1
- Rist, R.C., Boily, M.-H. and Martin, F. (2011) *Influencing Change: Building Evaluation Capacity to Strengthen Governance*. Washington, DC: World Bank. https://doi.org/10.1596/978-0-8213-8403-9

---

Canonical HTML version: https://khoi.co.uk/blog/danh-gia-thay-doi-truoc-trong-sau

> A personal blog by Le Quoc Khoi, not affiliated with, sponsored or reviewed by the University of Greenwich. “Greenwich” and “University of Greenwich” are names belonging to their respective owners. No copyrighted study materials are published here; theory and cases are retold in the author's own words and may not be fully accurate, so check the original sources.
